In June 17, 2019 a visit of Holcim Azerbaijan and representatives of LafargeHolcim was held in Georgia. Aim of this visit was to plan a repair work during operations in cement factory in Poti and technical inspection of factory equipment.
It is noteworthy that the satisfaction of increased demand on the market requires the detailed planning of technical services.
Our foreign partners positively evaluated the work of the Cement Division, also pointing out that, as a result of the technical inspection of the factory, the production of high quality cement can be achieved in accordance with the current maximum capacity of the plant.